ETERNAL CYCLE WORKS
  • Blog
  • Projects
    • Trike Truck
    • Torus Prototype
    • Catrike CoroVelo V2.1
    • Catrike CoroVelo V2
    • Catrike CoroVelo V1
    • Trike Trek '11 Velo
  • About
    • Velomobile FAQ
  • Contact
  • TT'11 Tour Journal
  • Blog
  • Projects
    • Trike Truck
    • Torus Prototype
    • Catrike CoroVelo V2.1
    • Catrike CoroVelo V2
    • Catrike CoroVelo V1
    • Trike Trek '11 Velo
  • About
    • Velomobile FAQ
  • Contact
  • TT'11 Tour Journal
Search by typing & pressing enter

YOUR CART

3/2/2024 0 Comments

Fabrication table done!

After getting my cargo trailer all fixed up, the first order of business was hauling about 500 lbs of steel home to use for this: the prerequisite tooling to help me build all my future projects, a welding table! I have built one for myself in the past, but had to part with it during the move to Boston. If you want to watch the entire process, scroll down! ​Now, I'm finalizing some design choices on the Trike Truck before I order the steel for it. More to come soon.
Picture
Picture
Some quick details on the table:

Top: 1/4" x 36" x 66" Hot-rolled steel, slots cut with an angle grinder.
Frame: 14ga 2"x2" ERW steel tubing
Shielding gas tank rails: 16ga 1"x1" ERW steel tubing
Height: About 30"
Bottom: Painted OSB
Casters: 6 in total, all have extendable rubber feet in case I want a level, stationary table
0 Comments

    Archives

    March 2024
    November 2023
    March 2023
    June 2021
    May 2021
    April 2021
    April 2020

    Categories

    All

Powered by Create your own unique website with customizable templates.